Installation of ceiling panels:

Preparation of the installation work

Stored the packages in a dry place, proteced against rain and sunlight.

Panellings should be stored loosely in the same environment in which it is expected to perform.  Acclimate the product at least a week in order to meet the proper installation requirements.

Ambient temperature and humidity at the installation site should be normal, with a temperature of approximately 20 °C and a humidity less than 50%.

Ensure that the walls or wall studs are straight prior to installation, with a stud spacing of no more than 400 mm, or 600 mm in walls.

The large surface should be install from the same production batch.

Installation:

Install the panels in the direction of light.

Make sure that the lighting is good during the installation.

Drive the wood panel with nail into the underside of the groove and the MDF panel at the base of the protruding tongue. Use a staple gun for the fastening. Drive the staples diagonally into the grooves. Do not drive the staples all the way through the panels, but let them penetrate far enough so that they do not hamper the installation of the next panel element.

Attach lamps or other heavy objects to the mounting base, not directly to the panel.

Leave the panel edges and ends of 15 mm for expansion. If the paneling area exceeds the length of width of 6 meters, is expansion gap added 2 mm per exceeded meter.

DO NOT INSTALL DEFECTIVE PRODUCT! MATERIALS INSTALLED WITH VISIBLE DEFECTS ARE NOT COVERED UNDER WARRANTY.